
Turnkey House Renovation Specialist Singapore
Comprehensive turnkey house renovations for HDB BTO flats, resale apartments, condominiums, and landed homes. One accountable project manager, transparent milestone pricing, and defect-free handover.
100%
Direct In-House Crews
Save 25%
No ID Markups
HDB/BCA
Full Permit Filings
12-Month
Direct Warranty
Our 4-Phase Turnkey Execution
Every renovation milestone is managed by dedicated in-house trade specialists with transparent sign-offs at each completion gate.

HDB/BCA Permit Submission, Protection & Structural Hacking
Safe Demolition with Full Floor & Lift Padding
We handle all mandatory HDB and MCST permit filings before commencement. Heavy-duty corrugated cardboard and corrugated plastic sheets protect common corridors, lifts, and existing fixtures before pneumatic hacking.

Wet Trade Masonry, Screeding & High-Precision Tiling
Laser-Guided Leveling with Zero-Hollow Bonding
Our master masons cast reinforced kerbs, shower drop kerbs, and pre-packed screed beds. Tiles are back-buttered with C2TE flexible cementitious adhesive and spaced with reusable leveling clips for flush, razor-sharp grout lines.

Architectural False Ceilings, Pelmets & Drywall Partitions
Heavy-Duty Galvanised Framing & Anti-Crack Finishing
We construct seamless drop ceilings, cove lighting pelmets, and acoustic drywall acoustic dividers using Saint-Gobain 9mm/12mm moisture-resistant boards mounted on hot-dipped galvanised steel channel grids.

Premium Surface Painting, Chemical Wash & Handover
Multi-Coat Skim Coat & Zero-VOC Anti-Bacterial Coating
Complete wall skimming with pre-mixed skim coat removes all undulations before 1 sealer coat and 2 topcoats of Nippon Odourless or Benjamin Moore paint. Deep chemical acid cleaning and joint sealant touch-up completes the handover.
Tailored Scopes For Every Singapore Property
Whether preparing a brand-new BTO or gut-renovating a 30-year-old resale flat, our packages are customized to your exact layout.
HDB BTO Flats
5 - 7 Weeks- Defect checking & joint inspection
- Whole-house flooring (Vinyl/Tiles)
- Kitchen full cabinet & quartz top
- Master wardrobe & vanity cabinet
- Living cove ceiling & full LED wiring
- Nippon Odourless all-room painting
HDB Resale Overhaul
8 - 10 Weeks- Full hacking of 2 bathrooms & kitchen
- BCA hacking permit & debris disposal
- Screeding, waterproofing & tiling
- Complete whole-house electrical rewiring
- PUB stainless piping replacement
- Full carpentry, doors, windows & paint
Private Condominium
6 - 8 Weeks- MCST compliance submission & deposit handling
- Corridor lift & lobby floor protection
- Luxury marble floor honing & crystallization
- Custom kitchen island & sintered stone tops
- Smart dimmer home automation loops
- Soundproof double-glazed window repairs
Landed & Commercial
10 - 16 Weeks- Roof waterproofing & facade repainting
- Structural wet trade & foundation masonry
- Heavy load 3-phase DB box upgrades
- Central air-con VRV trunking concealment
- Custom acoustic partitions & fire-rated doors
- Comprehensive site safety management
Direct Contractor vs Interior Design (ID) Firm
See why hundreds of Singapore homeowners choose Renovation Contractor SG over commissioned design brokers.
| Key Consideration | Renovation Contractor SG (Direct) | Typical ID Firm |
|---|---|---|
| Cost Structure | Direct wholesale contractor prices (Save 20% - 35%) | Heavily marked up to cover showroom rent & designer commissions |
| Workmanship & Craftsmen | 100% In-house tilers, carpenters, electricians & painters | Outsourced to 3rd-party sub-contractors with variable quality |
| On-Site Communication | Direct coordination with senior site supervisors & project managers | Sales coordinator acts as middleman; messages often diluted |
| Quotations & Variations | Detailed itemized breakdown per foot run with zero hidden clauses | Lump sum packages with frequent costly variation orders (VO) |
| Defect Rectification | Fast direct response within 24–48 hours under 12-month warranty | Often delayed while the designer argues with their subcontractor |
Frequently Asked Questions About House Renovation
How long does a full 4-room or 5-room HDB renovation take?
A full turnkey renovation for a 4-room or 5-room resale flat typically takes 6 to 8 weeks, while BTO flats with no existing hacking usually take 4 to 6 weeks.
Do you provide transparent milestone progressive payments?
Yes. Payment is split into clearly defined milestones: deposit on permit approval, hacking completion, wet trades/tiling completion, carpentry delivery, and final balance after joint defect inspection.
Are HDB permit submissions and corridor protection included?
Yes. All statutory HDB and BCA submissions, lift padding protection, and corridor cardboard wrapping are managed and included by our team.
Ready to Begin Your Home Transformation?
Send us your floor plan or schedule an on-site survey. We provide free layout consultation, transparent itemized quotes, and zero sales pressure.
